with John Collins, CB&I Lummus Technologies and Malay Bagchi, Indian Oil Corporation Ltd, Panipat Refinery
Joint-presentation by Owner/Operator and Licensor on the design and operational considerations that are essential to meeting the given DCU revamp objectives. Will address different types of revamps (capacity, reliability, feed-change, product yield enhancements) and primary facilities revisions (preheat circuit, heaters, safeguarding/interlocks systems, etc.) that are commonly modified.
Licensor to overview key project considerations (design, environmental, planning, constructability) as well as essential interactions and information (demonstrated capacity and limitations of existing unit) needed from the owner/operator.
Owner/operator to share project development/execution challenges and post revamp performance.
Leave a Reply
You must be logged in to post a comment.