India Cokers

Delayed Cokers in India 2019

Indian refiners recognize the value of delayed coking to meet the needs of their growing demand for transportation fuels in their expanding economy. The Delayed Cokers in India tables shows the name and location of DCU’s, the number of cokers, and number of coke drums. They indicate coker capacity, licensor, decoking equipment and commission date and alternate names for the refinery. A full size combination map and table is shown at the end of the page.

Name/LocationCoke DrumsCoker CapacityLicensorDecoking Eq & ValvesCommission DateUnheading
BORL Bina3 Drums60000ABB LummusFS-HH2010 Zimmermann & Jansen
BPCL Kochi4 Drum3.84 MMTPACB&I LummusFSFractionator installed 6/2015
CPCL Manali2 DrumABB LummusRuhrPumpenTarget 9/2016
CPCL Tamilniducontract 3 April 2019CLG
Essar Vadinar6 Drum6 MMTPA, Capacity achieved 7 MMTPACB&I LummusFlowserve. Also supplied enclosure facility to safeguard the cutting tool at the Top Unheading Device.March 2012. Current Cycle time : 15 hrsDeltaValve
HMEL Bhatinda4 Drum (9.14 m dia)2.77 MMTPAABB LummusRuhrPumpen2012Zimmerman & Jansen
HRRL Rajasthancontract 9 May 2019
IOCL 1 Barauni4 Drum20000EILRuhrPumpen1985manual trolley
IOCL 2 Barauni2 DrumEILFS-HH1985manual trolley
IOCL Bongaigon2 Drum + 2 Drum1979 - 1 MMPA, 1986 - 1.35 MMTPAEILFS-HH1981manual trolley
IOCL Digboi2 Drum170000 TPAEILFS-HH1942manual trolley
IOCL Guwahati2 Drum6,000EIL1990manual trolley
IOCL Gujarat4 drums (9.8 m dia x 42.9 m F-F)3.7 MMTPA (71 KBPSD)AmecFosterWheelerFlowserve; Steam Purge-Velan; top/bottom head Z&J, Blac Inc; Bridge crane-KonecranesApril 2011Zimmerman & Jansen
IOCL Haldia2 Drums (9.15 m dia x 40.8 m F-F)1.7 MMTPA (30 BPSD)AmecFosterWheelerRuhrPumpenIn detailed design
IOCL Panipat4 Drum60000CB&I LummusFlowserve2010Hahn & Clay
IOCL Paradip4 drum (9.8 m dia x 45.0 m F-F)4.1 MMTPA (71 KBPSD)amec foster wheelerRuhrPumpen2015DeltaValve
MRPL Mangalore4 Drum3 MMTPACB&I LummusRuhrPumpen4/2/2014Zimmerman & Jansen
NRL 1 Numaligarh2 Drum8,400FS-HHNew drums-2000, automation in 2015.
RIL DTA Jamnagar8 drum (8.8m dia)+2 (9.8 m dia)164 kbpsdAmecFosterWheelerFlowserve1999, 2017
DeltaValve
RIL SEZ Jamnagar8 drum (8.8 dia)175+ kbpsd, 12 hr cyclesAmecFosterWheelerFlowserve2009DeltaValve

Refinery Name and CompanyLocationAdditional
Bharat Oman Refinery Limited (BORL)Bina
Bharat Petroleum Corp Ltd (BPCL)Kochi (Ambalamugal)
Chennai Petroleum Corp. Ltd (CPCL)Bhatinda Formerly Madras
Chennai Petroleum Corp. Ltd (CPCL)Tamilnadu
Essar Essar Oil Limited.
Vadinar, Jamnagar, Gujarat
HPCL-Mittal Energy Ltd (HMEL)Bhatinda Guru Gobind Singh
HRRL Rajasthan, Barmer District
Indian Oil Corp Ltd (IOCL)Barauni, Bihar
Indian Oil Corp Ltd (IOCL)Barauni, Bihar
Indian Oil Corp Ltd (IOCL)Bongaigon, AssamBRPL
Indian Oil Corp Ltd (IOCL)Digboi, Assam
Indian Oil Corp Ltd (IOCL)Guwahati, Assam
Indian Oil Corp Ltd (IOCL)GujaratKoyali, Vadodara
Indian Oil Corp Ltd (IOCL)Haldia, West Bengal
Indian Oil Corp Ltd (IOCL)Mathura, Uttar Pradeshh
Indian Oil Corp Ltd (IOCL)Panipat, Haryana
Indian Oil Corp Ltd (IOCL)Paradip, Orissa
Mangalore Refining and Petrochemical Ltd (MRPL)MangaloreONGC
Numaligarh Refinery Ltd (NRL)Numaligarh (Assam)
Numaligarh Refinery Ltd (NRL)Numaligarh (Assam)
Reliance Industries Ltd (RIL)DTA, Jamnagar
Reliance Industries Ltd (RIL)SEZ (JERP), Jamnagar

Submit your updates to the India Coker list?


Refinery Name & Company

Refinery Location

Number of Cokers & Coke Drums

Coker Capacity

Licensor

Decoking Equipment

Commission Date

Other

Your Name - Optional

Your Email - Optional

Delayed cokers in India 21-May-2019